Client Details

Holiday Inn

SPV have worked closely with both Intercontinental Hotels Group and Realstar Group for many years and have carried out both large scale refurbishment works and minor emergency repairs to a vast number of Hotels in their estate.

Holiday Inn projects:

Holiday inn Hotel

SPV have recently completed the roofing works at The Holiday Inn Hotel, Newport. The Hotel had experienced persistent roof leaks to their very popular Gwent Function suite and SPV’s remit was to supply and install a new roof and alleviate any further roof leaks to the building. The contract…

More »

Holiday Inn

SPV Group have recently completed the glazing works at The Holiday Inn Hotel, Plymouth. The contract involved the supply and fixing of a secondary glazing system to the Restaurant Windows comprising of individual frames of 6.5 laminate glazing complete with the replacement of all internal cills on…

More »

Benchmark Fabrications, Letchworth

SPV are currently undertaking various roofing, cladding and glazing works at Benchmark Fabrications, Letchworth. The Contract which is being undertaken directly for the Client, Benchmark Fabrications involves a full re roof comprising of a torch on felt system, cladding , roof lights and glazing.…

More »

Holiday Inn Coventry

SPV have recently completed the concrete repair works at The Holiday Inn Hotel, Coventry. The contract involved the refurbishment of the existing spalled and delaminated concrete to the rear elevation fire escape staircase. Works were completed within budget and within the agreed timescales.

More »

Starbucks Coffee, Peterborough

SPV have recently completed concrete repair works at Starbucks Coffee Shop, Peterborough. The works involved building up the existing structure which had been damaged to match the existing in size and colour. The concrete repairs were undertaken by cutting into the stone and placing stainless steel…

More »

Crittal Windows installed at Holiday Inn Bexley

SPV have recently completed glazing works at Holiday Inn Bexley to supply and install Crittal windows to the front section of the Hotel. This traditional refurbishment project required the installation of Crittal windows due to planning constraints as the property is a Grade 2 Listed Building.

More »

Double Tree by Hilton- London Ealing

SPV have recently undertaken the roofing works to the Open Courtyard at The Double Tree by Hilton London Ealing Hotel. The contract involved the supply and erection of a framework to connect onto the 2 perimeter walls then the supply and installation of new deflection panels to blank off the open…

More »

Holiday Inn Hotel Washington

SPV have recently undertaken the roofing works to the High Level Bedroom Roof Area at the Holiday Inn Hotel, Washington. The contract involved the supply and lay of a 2 layer SPV High performance Elastomeric Fire Safe Roofing felt system including all details and finishes.

More »

Long Close School

SPV Group have recently completed the refurbishment works at Long Close School, Slough.

More »

25 Berkley Square

SPV are currently undertaking the extensive scaffolding works at 25 Berkley Square, London, working on behalf of Kraft foods through the Main Contactor, Commercial Design Solutions.

More »

Holiday Inn Mayfair

SPV have recently completed the liquid coating works at The Holiday Inn hotel Mayfair. The works were undertaken to the plant room roof in accordance with the Sika Liquid Plastics specification.

More »

Holiday Inn Plymouth

SPV Group have recently completed the refurbishment works to the Leisure Club at The Holiday Inn Plymouth following the extensive fire which engulfed the property in late 2010 on behalf of the Client, Queens Moat House Limited. SPV attended site the morning after the fire in order to undertaken all…

More »

Holiday Inn London Kensington Forum

SPV have recently completed the roof refurbishment works at The Holiday Inn Hotel, London Kensington Forum. A High Performance liquid coating system was applied to the 7th floor and 27th Floor to create a waterproof covering. Working along the Project Managers, Robertson Associates, the works were…

More »

Holiday Inn Gloucester

SPV Have recently completed the window replacement works at the Holiday Inn Gloucester. The contract involved the supply and installation of new aluminum double glazed window units to the conference suite providing a fresh clean look to the area. The works were completed within budget and within…

More »

Holiday Inn Runcorn

SPV Group have recently completed the window replacement works at The Holiday Inn Hotel Runcorn, Cheshire. The contract involved the supply and installation of new uPVC double glazed units including all associated trims and fixings to the car park elevation and Guest Room Windows.

More »

Holiday Inn

SPV have recently completed cladding works at The Holiday Inn Hotel, Leicester. SPV were instructed by their Client, Intercontinental Hotels Group to carry out the cladding works to the Spirit Heath and Leisure Club. The contract involved the supply and fixing of 0.7 PVF2 fabricated cladding panels…

More »

Holiday Inn Hotel Bloomsbury

SPV have recently completed the window replacement works at The Holiday Inn Hotel Bloomsbury, London. The contract comprised of the replacement of the existing windows to the bedrooms situated on floors 1, 2, 3, 4 & 5 to all elevations of the Hotel using new polyester powder coated double glazed…

More »

Holiday Inn Hotel Bloomsbury

SPV have recently completed the window replacement works at The Holiday Inn Hotel Bloomsbury, London. The busy Hotel remained in operation throughout the contract which involved the erection and dismantlng of scaffolding to carry out the works and the replcement of the existing windows with new…

More »

Holiday Inn Hotel, Milton Keynes

SPV have recently completed the works to renew the windows at The Holiday Inn Hotel, Saxon Gate, Milton Keynes. The works comprised of the replacement of the existing centre pivot casement windows to the bedroom block using new top hung aluminium windows to bring the windows up to Current Buidling…

More »

Holiday Inn Hotel, Haydock

SPV Group have recently installed a new atrium roof light at the Holiday Inn Hotel, Haydock. The previous rooflight was removed along with the timber frame. The new barrel vault rooflight was then installed over the Lounge Area of the Hotel. The double glazed rooflight was manufactured using…

More »

Holiday Inn

SPV have recently completed the refurbishment of the entrance area of The Holiday Inn Hotel, Notts Derby.

More »

Washington Holiday Inn

SPV have recently undertaken the glazing works to replace the defective aluminum windows/ timber doors to the Hotel Restaurant, the Hotel Conference Rooms, the Walkway between the Bedroom Block and Reception and The Beamish Suite.

More »

Holiday Inn

SPV carried out the external cladding refurbishment of the Holiday Inn Hotel, Bristol Filton. The new insulated plastisol cladding panels were installed to the front and side elevations of the Hotel to refurbish the existing bedroom block and conference areas to provide a modernized and updated look…

More »

Holiday Inn

SPV carried out the renewal of the front and side elevation fascias at The Holiday Inn Hotel Rugby/ Northampton. The new fascias were supplied and installed in line with Holiday Inn branding to refurbish the front entrance of the Hotel. The project also involved the formation of the new entrance…

More »

Holiday Inn

SPV have recently completed the extensive external refurbishment project at The Holiday Inn Hotel, Cardiff Centre. The project involved the erection of scaffolding to all elevations to carry out the works, the strip out of all asbestos materials, the overcladding of the entire building, the…

More »