SPV were called in to assist the client with their worn and ineffective waterproofing on a four storey building located in the heart of St Helier.
A flexible yet durable surface was needed by the Client to refurbish this project as the roof area was to be once again used to provide valuable car parking space. SPV firstly repaired any defects in the existing mastic asphalt surface, then applied High Bond primer and Modified High Performance Underlay. The system was completed with an application of MR2 Road carpet to provide a robust surface.
Due to the city centre location with limited access and stringent Heath and Safety requirements, completing this project on time, to budget and with minimal disturbance was a challenge which was undertaken and successfully accomplished by a team of our highly trained and experienced operatives.