SPV have recently undertaken the glazing works to replace the defective aluminum windows/ timber doors to the Hotel Restaurant, the Hotel Conference Rooms, the Walkway between the Bedroom Block and Reception and The Beamish Suite.
The existing glazing was removed and a new upgraded Low Emission Toughened Glass was installed which also provided an improved u-value to that which was previously being achieved.
All installations were carried out in accordance with GGF Guidelines.